{"componentChunkName":"component---src-templates-post-query-tsx","path":"/blog-post/behavior-change-order-from-the-modws/","result":{"pageContext":{"post":{"slug":"/blog-post/behavior-change-order-from-the-modws/","title":"Behavior change order to states from the MoDWS!","date":"Jul 23, 2014","timeToRead":1,"description":"","body":"function _extends() { _extends = Object.assign || function (target) { for (var i = 1; i < arguments.length; i++) { var source = arguments[i]; for (var key in source) { if (Object.prototype.hasOwnProperty.call(source, key)) { target[key] = source[key]; } } } return target; }; return _extends.apply(this, arguments); }\n\nfunction _objectWithoutProperties(source, excluded) { if (source == null) return {}; var target = _objectWithoutPropertiesLoose(source, excluded); var key, i; if (Object.getOwnPropertySymbols) { var sourceSymbolKeys = Object.getOwnPropertySymbols(source); for (i = 0; i < sourceSymbolKeys.length; i++) { key = sourceSymbolKeys[i]; if (excluded.indexOf(key) >= 0) continue; if (!Object.prototype.propertyIsEnumerable.call(source, key)) continue; target[key] = source[key]; } } return target; }\n\nfunction _objectWithoutPropertiesLoose(source, excluded) { if (source == null) return {}; var target = {}; var sourceKeys = Object.keys(source); var key, i; for (i = 0; i < sourceKeys.length; i++) { key = sourceKeys[i]; if (excluded.indexOf(key) >= 0) continue; target[key] = source[key]; } return target; }\n\n/* @jsxRuntime classic */\n\n/* @jsx mdx */\nvar _frontmatter = {\n  \"title\": \"Behavior change order to states from the MoDWS!\",\n  \"date\": \"2014-07-23\",\n  \"template\": \"post\",\n  \"slug\": \"behavior-change-order-from-the-modws\",\n  \"postedLink\": \"https://riceinstitute.org/blog/behavior-change-order-from-the-modws/\",\n  \"old-tags\": [\"awareness-campaign\", \"public-policy\"],\n  \"description\": \"\",\n  \"tags\": \"Blog Post\",\n  \"banner\": \"\"\n};\nvar layoutProps = {\n  _frontmatter: _frontmatter\n};\nvar MDXLayout = \"wrapper\";\nreturn function MDXContent(_ref) {\n  var components = _ref.components,\n      props = _objectWithoutProperties(_ref, [\"components\"]);\n\n  return mdx(MDXLayout, _extends({}, layoutProps, props, {\n    components: components,\n    mdxType: \"MDXLayout\"\n  }), mdx(\"p\", null, \"Just 12 days after \", mdx(\"a\", {\n    parentName: \"p\",\n    \"href\": \"http://riceinstitute.org/wordpress/2014/07/09/another-misguided-toilet-building-target/\",\n    \"target\": \"_blank\",\n    \"rel\": \"noopener noreferrer\"\n  }, \"the order\"), \" to states to construct over 5 million toilets by the end of August, the Ministry of Drinking Water and Sanitation issued \", mdx(\"a\", {\n    parentName: \"p\",\n    \"href\": \"http://mdws.gov.in/hindi/sites/upload_files/ddwshindi/files/Swachchh_Bharat_by_2019.pdf\",\n    \"target\": \"_blank\",\n    \"rel\": \"noopener noreferrer\"\n  }, \"another order\"), \", addressing the need to \\u201Csensitize the rural population on sanitation,\\u201D by educating about and encouraging the building \", mdx(\"em\", {\n    parentName: \"p\"\n  }, \"and use\"), \" of toilets. The order accurately points out that:\"), mdx(\"blockquote\", null, mdx(\"p\", {\n    parentName: \"blockquote\"\n  }, \"One of the biggest challenges in making the country ODF is triggering behavioural change in the population to accept the need for building and using toilets. A large number of people amongst the Indian population are still unconvinced of the need to build toilets in their homes. In this connection, coordinated effort by all the Departments of the State Government that have interface with rural populations is required.\")), mdx(\"p\", null, \"It is heartening to see the new government directly acknowledging the lack of demand for toilets, and talking about the need for behavior change. In asking several ministries (Education, Health, Panchayati Raj, Women and Child Development) for their participation, and encouraging \\u201Cfunctionaries at all levels to help India become ODF by 2019,\\u201D we're cautiously optimistic that this is just the beginning of a larger plan to launch a latrine use revolution in India.\"));\n}\n;\nMDXContent.isMDXComponent = true;","tags":[{"name":"Blog Post","slug":"blog-post"}],"banner":null}}},"staticQueryHashes":["318001574","3787687951","3787687951"]}